Natspec Case Study – D’Aguilar Childcare, QLD
D’Aguilar Childcare Center, located in D’Aguilar, Queensland, was in a high-risk termite zone. The developer, having previously experienced termite damage that interrupted operations, sought a durable solution to prevent future infestations.
Requirement
The main need was for a termite barrier system that offered long-lasting protection and met AS3660.1 standards. The system also had to be environmentally friendly, safe for staff and children, easy to maintain, and come with a comprehensive termite damage warranty.
Approach
The Kordon termite system was selected for its effectiveness. This physical barrier prevents termites from entering buildings undetected. Installed by a Kordon-accredited installer, it integrates seamlessly into the construction, positioned between building elements.
Kordon uses deltamethrin, a synthetic pyrethroid that kills and repels termites. The deltamethrin is embedded in a fibrous webbing, laminated with a UV-stabilized plastic. The orange top layer acts as a moisture barrier, while the black bottom layer encapsulates and protects the barrier.
Results
The Kordon system successfully prevents concealed termite ingress and infestation. It requires no maintenance beyond annual inspections for warranty upkeep. The system is environmentally friendly, avoiding large-scale chemical use. NCC recommends annual professional inspections to ensure its effectiveness.
Benefits
Designed for Australian conditions, the Kordon system offers an industry-leading warranty and over 50 years of life expectancy without maintenance. It poses no health risks and is a cost-effective solution, providing peace of mind to the developer. Accredited professional installation and robust design further assured the developer of the center’s long-term protection.
Architect: Neylan Architects
Builder: QLD Project Professionals P/L
Installing Company: National Pest Solutions





